December 2024 Radium Hot Springs Draft OCP Presentation - Flipbook - Page 117
APPENDIX 1. MASTER PLANS
MASTER PLAN SUBMISSION REQUIREMENTS
WHAT IS A MASTER PLAN?
A Master Plan is a comprehensive plan for
a subdivision or a large development (e.g.
multi-unit residential building or commercial
development) that may include supporting
studies and reports. A master plan should
be a single document that combines all
relevant maps, drawings, studies, and reports
into one comprehensive package for review
by the municipality as part of a planning
or development application (e.g. rezoning,
subdivision, development permit).
A Master Plan Table of Contents should follow
this format:
1. Project Rationale (e.g. text and drawings
describing the proposed development)
2. Support Studies and Technical Reports
as Appendices
WHEN IS A MASTER PLAN REQUIRED?
The Village’s new Of昀椀cial Community Plan
(OCP) requires submission of a master plan for
several types of developments and subdivisions.
In general, larger developments and multi-lot
subdivisions require submission of a master
plan. Please consult the OCP for whether your
development requires a master plan.
WHAT IS REQUIRED?
The following items are required to be
submitted as part of a Master Plan:
1. Site plan drawing to scale identifying:
a. Location of legal property lines
and setbacks from property lines of
any existing or proposed buildings
or structures;
b. Road access and parking area(s) and
estimated number of parking stalls;
c. Landscaping / sidewalks /
internal pathways;
d. Location of adjacent roads / pathways /
sidewalks / buildings / structures;
e. Drainage patterns;
f. Slopes (if applicable);
g. Proposed subdivision lines
(if applicable);
h. Features that will be kept (e.g. buildings,
trees, shrubs, natural areas);
2. Project Rationale Report describing
the development:
a. Other items that may be required as
part of a development, re-zoning, or
subdivision application;
b. Elevation drawings (optional or may be
required depending on the complexity
of the development); and
c. Development Permit Application, if the
site is within a Development Permit Area
(see OCP for details).
3. Technical Reports or Studies (as required by
the Village) as Appendices, may include, but
not limited to:
a. Drainage / stormwater
management report;
b. Geotechnical Study;
c. Historical Resources Review;
d. Biophysical / Environmental / Wetlands
Study or Inventory;
e. Environmental Site Assessment (to
evaluate potential contamination of
a site);
f. Servicing Strategy or Study (e.g. water,
sewer/septic); and
g. Transportation Study (access, egress,
traf昀椀c management, anticipated
traf昀椀c volumes).
Appendices
112